ChargingNC

The electric future is still charging ahead

Federal EV tax credits ended in 2025. A year later, North Carolina is building chargers, batteries and jobs, and the national numbers show demand that stands on its own. Here is the news we are watching.

Wondering what this means for your property or fleet?

2026 by the numbers

80,000+public fast-charging ports in the U.S.
17.6Mfast-charging sessions in July, a monthly record
6.5%EV share of new-car sales in Q3, up from 5.8%
$14.4Min new NC charging awards across 14 communities

The incentives are gone. The numbers are real.

The $7,500 federal EV tax credit ended on September 30, 2025, and sales dropped as buyers who rushed to beat the deadline sat out. That reset was painful, but it gave investors and business owners something valuable: a clear look at demand without subsidies.

A year later, that demand is holding and growing. EV sales rose again in the third quarter, public fast-charging use hit record highs, and new chargers come online every quarter. The case for electrification now rests on operating costs, reliability and real-world results.

  • Organic demand. Every EV sold in 2026 sold without a federal purchase credit.
  • Usage is rising. Charging sessions are setting records as networks grow.
  • Savings that pencil out. Small fleets are publishing fuel costs that are hard to ignore.
  • Affordable trucks are coming. Electric pickups under $30,000 from Ford and Slate are on the way.
  • North Carolina is investing. State charging awards, Triangle-based companies and a major battery plant are all moving forward.

North Carolina news

Chargers, factories and companies taking shape across our state.

North CarolinaNCDOT

$14.4 million more for fast chargers along NC highways

NCDOT awarded its second round of federal NEVI funding to eight businesses that will build and operate charging stations in 14 communities, including Asheboro, High Point, Kinston, Raleigh, Wadesboro and Weaverville. They join five NEVI stations funded in 2024, and NCDOT expects the full network to be finished in about three years.

Why it matters: More dependable highway charging removes one of the biggest worries for drivers and fleet managers planning longer routes.

Read the NCDOT release (opens in a new tab)
North CarolinaThe Next Web

Durham-based IONNA doubles its network and tops J.D. Power

IONNA, the charging company owned by eight automakers and headquartered in Durham, now runs more than 180 U.S. sites, over twice what it had at the start of 2026. In its first year of eligibility, it earned the top score in J.D. Power's 2026 public fast-charging satisfaction study.

Why it matters: One of the fastest-growing charging networks in the country is being built from the Triangle, and drivers are rating it highly.

Read the story (opens in a new tab)
North CarolinaThe EV Report

Durham-built fast chargers headed to four NC towns

PowerUp America won four NEVI awards for fast-charging stations in Chocowinity, Plymouth, Wadesboro and Whiteville. Kempower, which runs its North American headquarters and manufacturing in Durham, will supply the equipment, and the stations are targeted to open in mid to late 2027.

Why it matters: Charging dollars are reaching rural corridors and supporting North Carolina manufacturing at the same time.

Read the story (opens in a new tab)
North CarolinaWFAE

Court ruling clears the road for NC's charger buildout

A federal judge found the 2025 freeze on NEVI charging funds unlawful. NCDOT had already restarted its program, and the ruling gives developers more certainty that they will be reimbursed as they invest in multimillion-dollar projects.

Why it matters: Certainty is what private builders need. With funding settled, more stations can move from planning to construction.

Read the story (opens in a new tab)
North CarolinaNCDOT

NC steers charger money toward rural towns and the mountains

Using new federal flexibility, NCDOT scaled back planned corridor stations from 41 to 16 so it can direct more NEVI funding to rural towns and roads like I-26, where chargers are scarce. The program reimburses private companies up to 80 percent of the cost to build and operate stations for five years.

Why it matters: Communities that have been left out of the charging map are next in line, and private operators get strong support to serve them.

Read the NCDOT release (opens in a new tab)
North CarolinaWUNC via WHQR

Toyota's $14 billion battery plant is up and running in Randolph County

Toyota's only battery plant outside Japan is producing in Liberty and plans to grow to about 5,000 workers. The plant was designed to shift its mix of cells as demand moves between hybrids, plug-in hybrids and fully electric vehicles.

Why it matters: North Carolina is not only installing chargers. It is building the batteries that power electrified vehicles.

Read the story (opens in a new tab)

National news

The bigger picture: sales, charging and the vehicles on the way.

NationalCox Automotive

EV sales climb back without federal incentives

Americans bought an estimated 266,630 EVs in the third quarter of 2026, up 7.7 percent from the second quarter and the best result since the pre-deadline rush of 2025. EVs reached about 6.5 percent of new-vehicle sales, and counting hybrids and plug-ins, nearly a quarter of all sales were electrified.

Why it matters: Every one of these sales happened without a federal purchase credit. That is a clean read on real demand.

Read the Cox Automotive report (opens in a new tab)
NationalInsideEVs

U.S. fast charging passes 80,000 ports

The U.S. added 4,106 public fast-charging ports in the third quarter, pushing the national total past 80,000. Drivers set a monthly record in July with 17.6 million fast-charging sessions.

Why it matters: Usage is climbing along with supply, which is the signal investors and site hosts look for.

Read the story (opens in a new tab)
NationalElectrek

A small contractor's fuel bill: $698 versus $7,515

A small construction company shared a year of real costs. Its Ford E-Transit covered more than 27,000 miles for $698 in charging, while its gas Ram ProMaster used $7,515 in fuel over 29,976 miles. The owner noted a learning curve with route planning but called the savings dramatic.

Why it matters: This is the kind of real-world number small fleets need, and it is exactly what our Fleet Pilot Program is built to measure.

Read the story (opens in a new tab)
NationalCBT News

Ford's Fathom electric pickup will start at $28,350

Ford named its new midsize electric pickup the Fathom and set a starting price of $28,350 before destination. Pre-orders open in early 2027, with deliveries later that year.

Why it matters: Affordable work-ready trucks make electric a realistic option for small businesses and local fleets.

Read the story (opens in a new tab)
NationalEV Magazine

Slate's $24,950 electric truck opens pre-orders

Slate Auto priced its simple, customizable electric pickup at $24,950 and opened pre-orders, with about 205 miles of range and first deliveries expected before the end of 2026.

Why it matters: A new class of low-cost electric trucks is arriving, built to be practical rather than flashy.

Read the story (opens in a new tab)

Headlines and summaries are written by ChargingNC based on public reporting. Follow each link for the full story. The ticker above links to the weekly show The Current by Miss GoElectric on YouTube; ChargingNC is not affiliated with her channel. Last updated November 17, 2026.

Put real numbers behind your plan

Curious what going electric would cost, and save, for you?

We will look at your property, your vehicles and how you drive, then show you the numbers.